A sprinkler system must get a visual inspection every week and a more complete inspection every month; the owner or their representative can do these if they have the minimum knowledge required. Inspections and tests every 3 months, every year, and every 5 years, 10 years or more must be done by a specialized firm, under the NFPA 25 standard. This page lists the businesses that offer fire sprinkler inspection and maintenance in Quebec.
4 businesses found
Map of businesses
The interactive map appears when you interact with the page.
Laval, Laval
Québec, Capitale-Nationale
Québec, Capitale-Nationale

Previo
Your fire safety plan and your emergency response plan, online and always up to date.
Discover PrevioQuébec, Capitale-Nationale

Evacuation drill
Planning, timing, debriefing and compliance report.
Plan an evacuation drill
Custom plans
Our team prepares your custom evacuation plans.
See custom evacuation plans
Do it yourself
Evacuation plan, fire department intervention plan or hazardous materials plan, in a free application.
Create my plan for freeAccording to the RBQ inspection register guide, the requirements for sprinkler systems and standpipe systems are in the NFPA 25 standard, "Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems".
| Frequency | What is done | By whom |
|---|---|---|
| Every week | Visual inspection and reading of gauges and other instruments. | Owner or their representative, if they have the minimum knowledge required, or a specialized firm |
| Every month | The weekly inspection is replaced by a more complete inspection. | Owner or their representative, if they have the minimum knowledge required, or a specialized firm |
| Every 3 months | More thorough inspections and tests, in addition to the monthly inspection. | Specialized firm |
| Every year | More thorough inspections and tests, in addition to the monthly inspection. | Specialized firm |
| Every 5 years, 10 years or more | Additional tests and inspections. | Specialized firm |
For the 3-month and annual inspections and tests, you must obtain a complete report and keep it. The report for the 5-year, 10-year or longer tests and inspections must be kept for 5 or 10 years, depending on the inspection.
The frequencies shown summarize the inspection register guide (Guide sur la tenue du registre d'inspection) published by the Régie du bâtiment du Québec (RBQ), 2020 edition. Exact requirements depend on the building and its use, and the municipality or the insurer may require more. This page is general information and does not replace professional advice.
Before hiring, ask what report the business will give you after each visit, check that it holds valid liability insurance and, when the work requires a licence from the Régie du bâtiment du Québec (RBQ), that it holds the appropriate licence. Also ask about its experience with your type of building.
The directory badges help you narrow things down. The "GCA Approved" badge identifies a responsible contractor with valid liability insurance or an RBQ licence with a valid bond. The "GCA Partner" badge is equivalent to GCA Approved, and the business has also completed training to carry out GCA-approved services.
According to the RBQ guide, a sprinkler system gets a visual inspection every week, replaced once a month by a more complete inspection. More thorough inspections and tests are done every 3 months and every year, followed by additional tests every 5 years, 10 years or more. These requirements come from the NFPA 25 standard.
Yes, for the weekly and monthly inspections, provided they have the minimum knowledge required; a representative or a specialized firm can also do them. The 3-month, annual, and 5-year, 10-year or longer inspections and tests must be done by a specialized firm.
The weekly sprinkler system inspection is a visual inspection that includes reading the gauges and other instruments. Once a month, it is replaced by a more complete inspection.
After the 3-month and annual inspections and tests, you must obtain a complete report and keep it. The report for the 5-year, 10-year or longer tests must be kept for 5 or 10 years, depending on the inspection. In general, unless stated otherwise, an inspection register may not be destroyed within two years of its creation.
Ask what report the business will provide, check its liability insurance and its RBQ licence when the work requires one, and ask about its experience with your type of building. In this directory, the "GCA Approved" badge identifies a responsible contractor with valid liability insurance or an RBQ licence with a valid bond.